A grade sandstone block placed on solid road base to create this Ampitheater at runcorn state school
we conducted the site works for prep drilled the peir holes old path removal.
steel and concrete to crete this extention of the undercover area
site preped this one with the removal of overgrowth, supplu and install fresh premium garden soil, creta the access path way around the building.
supplied and install 230 plants, all native and council approved plants.
to this project was the creation of open space with 330 sqm of turf 40 m of 2.1 lapped fence for sound and privacy to the residents next door.